Your Home Transformation Starts Here!
Your Exterior Painting To-Do List & Action Plan!
We Are Here To Help You Every Step Of the Way. Please call or email us if you have any questions!
EXTERIOR HOUSE PAINTING TO-DO LIST
Please Be Prepared For Our Exterior Painting Crews Arrival By Doing The Following Things:
WE NEED YOUR PAINT COLOR SELECTION - Click here to fill out and send us your EXTERIOR PAINT COLORS! Below is helpful information about paint color sheen.
Take note of any special concerns you may have about your project and be sure to tell our crew leader
- CUSTOMER RESPONSIBILITIES: Before we arrive, we ask that our customers please remove any valuable or fragile items from the workspace. This includes removing small accessories, decorations, patio furniture, and grills away from the house. Our crews will help move any larger items, but A New Leaf Painting will not be held responsible for any valuable items left in the workspace that may incur damage.
- HOUSE ACCESS / KEYS & LOCK BOXES: (A GAME PLAN IF NEEDED.) Occasionally, no one can be at the property to provide access. The majority of clients who hire us, do so because they feel comfortable with us in their homes during work hours. We may need to have access to your home even if we are doing exterior work, we will need to open exterior doors to paint them. If needed, we have lock boxes that can be discreetly placed outside your home in order to keep your key onsite to ensure we have access.
- PAINT COLORS - Select final paint colors at least 5-7 days prior to the start of the project! If you plan to color-match your existing colors, please let us know via email!
- PAINT FINISH - Select a finish for the body: Flat or Satin (we use satin and semi-gloss for doors & trim and flat for ceilings). SUBMIT YOUR EXTERIOR COLORS HERE!
- ARRIVAL TIME: Our painting crews usually arrive between 7:30-8:30 AM on the first day of starting your project. However, going forward they prefer to arrive early. Although, you can let them know the best time for you and your family and they will work within these times.
- WORK HOURS: We may work longer hours than the other trades. Upon special circumstances, we may stay later than 5:30 pm.
- LANDSCAPING: Cut away any landscaping (bushes, trees, branches, & grass) that is growing up against the side of the house. Make sure the lawn is cut and weed-eat along the edges.
- BATHROOM/RUNNING WATER: Make sure when painters arrive, there is access to water and power. Let our crew leads know which areas of the home would be best to set up shop and have a staging area for tools and equipment. Please let's know which bathroom our team can use.
- CHANGE ORDERS: If there are any significant changes from the painting proposal, the OPERATIONS MANAGER will gladly write you up a change order estimate and request your authorization via signature before any additional work can begin.
- PREVIOUS DAMAGE: From time to time the estimators (and you) may miss some previous damage (i.e.: broken windowpane, over-spray from the previous painter, broken furniture, etc.). We want you to know that our crews will take the initiative to admit to existing/accidental damage they may cause and will make it right. If we should find any damage, we will inform you before starting that area. If you would like us to repair the item, it will require a change order.
- PUNCH LIST: Feel free to leave written messages for the painters if you are at work. The CREW LEADER should ask you to do a walk-through the day before completion to see if there are any corrections to be made.
- FINAL WALKTHROUGH: On the last day of the project, we ask the customer to be available for a final walkthrough with the crew leader to ensure all work is acceptable and up to expectations. If the customer does not make themselves available, we may not be able to reschedule and the walkthrough will need to be done by them due to scheduling restrictions.
HELPFUL ARTICLES ABOUT PAINT COLORS AND SHEEN/FINISHES
Here are a few helpful blog posts about color and paint finishes/sheens
- Need help picking colors? Professional Color Consultation Services.
- Need Color Ideas? Here is a list of the Top 50 Selling Sherwin Williams Paint Colors
- What Does House Paint Color Finish Mean?
OUR EXTERIOR PAINT PREPARATION PROCESS AND TIMELINE
Our Avg Exterior Painting Job Takes Roughly 4-6 Days. (under 3000 sq. ft.)
Step #1 - Pressure Washing
Your home’s exterior will be power-washed or hand washed to remove dirt and mildew. Pressure Washing is a critical step in the painting process. This helps create clean surfaces for the new paint to adhere to properly.
Step # 2 - Prep, Repair, & Protection
Any loose paint is scraped, glossy areas are scuff-sanded and any gaps are caulked to prevent water intrusion. All stucco cracks are filled with a stucco base sealer. We cover up and protect all none painted surfaces such as plants, shrubs, windows, and lights with plastic and tape. Our staff has the skills to address your carpentry repairs, wood, siding, and stucco repairs!
Step #3 - Start Applying Paint
After the preparation process areas are primed as necessary, premium-quality paint is applied to create a uniform finish.
Step # 4 - Clean Up
At the end of each day, the painting crew cleans up around your home, ensuring any paint chips are removed and all materials are stored neatly away.
Step # 5 - Inspect
After we are completed, your job crew leader will walk you through the project, giving you the opportunity to review our work and to provide any initial feedback. We will address any of your concerns.